Contact Us

200 East Walnut Street
Washington, IN 47501
Get Directions

  • Phone: 
    (812) 254-1091
  • Staff Directory

900 E (Cannelburg Road) project closure between 100 N and 200 N to begin on 6/1/21 (click here for details)

back

The contractor on the 900E (Cannelburg road) project expects to set up the road closure on CR 900E on 6/1/2021.  This could be moved back a couple of days depending on weather, deliveries, etc.  The detour will be set up to follow US 50, CR 650E and CR 550N.  The initial closure should only affect the area between CR 100N and CR 200N.  It will be accessible to Local Traffic Only.  There will be times when even local traffic will be restricted to one lane and there could be delays at certain periods of time.  The first full closure, approximately a week, isn’t expected until late June into July for box culvert installation.  And eventually,  late August, another full closure will occur for removal and replacement of the bridge over Flat Creek.  This closure will be more lengthy, possibly 4 to 6 weeks.  I will notify you prior to each of these full closures when a more exact date is known.  If you have any questions, feel free to contact the Highway Department at (812) 444-5798.